1059
I have been getting the Cab ready for paint, so this has meant moving the Bed
and other pieces have had to be removed, so this gave me the chance of
finishing these Storage Locker Frames, if you look carefully you can see the
Floor support tabs, the ply floor will sit on top of the inner 2 x 1 RHS

1060
Here you can also see the floor support tabs on the rear end piece
These Tabs are on the long outer piece and both ends.