My COE Page 411
Back
To page 412

I have been getting the Cab ready for paint, so this
has meant moving the Bed
and other pieces have had to be removed, so this gave me
the chance of
finishing these Storage Locker Frames, if you look
carefully you can see the
Floor support tabs, the ply floor will sit on top of the
inner 2 x 1 RHS

Here you can also see the floor support tabs on the rear end
piece
These Tabs are on the long outer piece and both ends.
All the welding and grinding has now been done on these
frames